• 0111-2022

    Current transformer power take-off device

    Features ● Output standard DC voltage ● Power-taking CT open-close structure, easy to install and operate ● The power conversion device is fixed with screws, which is easy to install ● Reserved for external energy storage device port

  • 3110-2022

    Current Transformer and Potential Transformer

    Also known as CTs, current transformers are devices that measure alternating current. They are widely used to measure high magnitude currents. A current transformer essentially lowers (steps down) a high current to a lower, safer level that you can manage properly. It steps down the current to be measured so that you can measure it with an average range ammeter.

  • 3010-2022

    High Precision Current Transformer

    ● low price ● Various sizes ● Asymmetrical PCB mounting mode ● Single-turn through-core primary winding application ● Applied to occasions requiring high precision and small phase error ● Applied to high-precision measuring devices for current, power and electric energy

  • 2910-2022

    single-turn current transformer Core column type

    Core column type: The primary coil is a copper column installed in the wall-penetrating magnetic sleeve, and the wall-penetrating The magnetic sleeve is the main connection between the primary coil and the secondary coil and the primary coil to the ground.

  • 2608-2022

    How many open current transformers should be installed in the distribution box, do you know?

    When we open the power distribution cabinet, we can see that there are many current transformers in it. Some power distribution cabinets have only one, and some even have five or six. In fact, they all induce current signals from the bus, but the measured currents have different effects. So what role do they all play in the power distribution cabinet?

  • 2108-2022

    Application of current transformers

    The wiring of the current transformer should follow the series principle: that is, the primary winding should be connected in series with the circuit under test, while the secondary winding should be connected in series with all instrument loads.

  • 0606-2022

    Enterprises adapt to mobile office

    In many work links, such as quotation, after-sales, logistics, etc., during the epidemic, we did not completely press the pause button, but all departments worked together and cooperated to promote the promotion and development of business and various tasks.

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy